The Illinois Tollway congestion relief program converted mainline toll plazas to barrier-free, non-stop Open Road Tolling. Chastain performed drainage design services for Crawford, Murphy & Tilly, Inc. as part of the conversion of Plazas 17 (Devon Ave) and 19 (River Road) on the Northwest Tollway (I-90).
Services Provided
- Hydraulic survey of the Des Plaines River.
- Detention analysis and design
- Accessing compensatory storage requirements.
- Concept drainage report.
- Ditch design, inlet spacing and storm sewer sizing calculations.
- Existing drainage and demolition plans.
- Proposed drainage plans with corresponding special provisions and cost estimates.
- $1.6 million construction cost.